Make One Flow Real in 30 Days.
For the vibe-coded prototype that got real signups and hit a wall or a new core workflow built from scratch. A senior engineer takes architectural ownership of one flow and ships it to production, not another disposable prototype.
This Sprint Is For
- A Lovable, Claude Code, or Codex prototype that has real users but can't be safely extended further
- You want the engineer building it to also own the architecture, not just execute a spec
- Founders validating a new idea before a raise, or a single AI feature bolted onto an existing product
Not the Right Fit?
Not a stripped-down toy build, a small number of budget shops promise a working app in three weeks with no security pass and no handover docs. This sprint ships less scope, not less quality, and the person shipping it owns the architecture, not just the code.
A 30-day sprint isn't a lesser version of a real build, it's a real build with a smaller footprint. Your engineer acts as lead engineer and architect on the piece you're shipping, with the same production standards as our 90-day sprint, scoped to exactly one thing that has to work.
One flow, owned end-to-end, shipped to production.
Lock the one thing that matters.
Scope & Foundation
AI-assisted research and planning compress scoping into days. We agree on the single workflow that proves your idea, then set up architecture, auth, and the base system.
Deliverables
- Scope Lock & Success Criteria
- Architecture & Data Model
- Auth & Access Setup
- Environment & Deploy Pipeline
Breakdown
Build only what proves the idea.
Build the Core Flow
The full engineering effort goes into the one workflow you're validating, end to end, connected to real data, not a mockup.
Deliverables
- Core Workflow, End to End
- Real Data & API Integration
- Working UI, Not a Prototype
- Weekly Progress Demo
Breakdown
Ship something you can show.
Harden & Ship
Security basics, a bug pass, and deployment, so what you demo is live, not a local build someone has to run for you.
Deliverables
- Security Basics Review
- Bug Fixes & Polish
- Production Deployment
- Documented Handover
Breakdown
What You Receive
A Real Demo Date
A committed 30-day timeline with one clear deliverable.
Weekly Progress
You see working software every week, not status updates.
Lead-Engineer Ownership
One senior engineer owns architecture and code, not a spec handed to a junior.
Live, Not Local
Deployed to production and demoable, with a documented handover.
Keep Building Afterward
Once this sprint ships, the same team can keep going, extend scope, add features, or move to a growth retainer.
Extend the Scope
Roll straight into a 60 or 90-day sprint to build out the rest of the product.
Maintenance Plan
Keep the shipped workflow secure and dependency-healthy.
Sprint Cadence
Not the Right Length?
Your Validation Sprint, Live in 30-Day
Book a call and tell us your idea. Within 48 hours we will map your scope, timeline, and a clear plan to get you shipped.